Airport Improvements

King Air Run-Off Departure End Rwy 24

This section of the website is dedicated to postings of background information and facts related to the 2007 & 2008 Airport Layout Plans (ALP) and 2009 Environment Assessment Study (EA) current underway.  Material posted at this site has been or will be presented to the EA citizens advisory committee for inclusion as exhibits to the final EA study.

The public is encouraged to forward fact based materials for posting at this site to a2gena2@gmail.com.  Please allow 3 to 5 days for posting as all material will be verified for accuracy.  If any material is found to be inaccurate or containing an error, please immediately notify us at a2gena2@gmail.comdiscribing the error and recommended corrective action as we are committed to only disseminating fact based information to the public.

In addition to this site, all interested parties are reminded that the best source of information is downloading either the FAQ condensed version or FAQ technical version at Ann Arbor Municipal Airport’s website.  Admittedly, the technical FAQ’s contains more detail than probably necessary, but is the most comprehensive analysis available to date until the User Survey, Economic Impact Study, and EA Study become available.    

MedFlight Run-Off Rwy 06 at State St

  • Runway Safety Margin Enhancement Project PowerPoint Presentation, Pages 1-31
  • Runway Safety Margin Enhancement Project PowerPoint Presentation, Pages 32-61
  • DRAFT-Environmental Assessment Study, Part 1
  • DRAFT-Environmental Assessment Study, Part 2
  • DRAFT-Environmental Assessment Study, Part 3
  • DRAFT-Environmental Assessment Study, Part 4
  • DRAFT-Environmental Assessment Study, Part 5
  • Environmental Assessment Study Comments
  • 2007 Airport Layout Plan
  • 2008 Airport Layout Plan
  • 2006 Airport Rules and Regulations
  • Airport FlyGREEN Program
  • Bird Habitat Management Program
  • Noise Abatement Program
  • Runway Overrun Summary
  • How was 800′ Runway Safety Margin Extension Determined?
  • Washtenaw County Road Commission State Road Corridor Study
  • Washtenaw County Road Commission State Road Corridor Study Resolution
  • Pittsfield Township Lohr/Textile Greeway Project
  • Summary Average Real Estate Sale Price v Annual Operations
  • 1979 Ann Arbor & Pittsfield Township Policy Statement & 2009 Supplementing Statement
  • 1992 ARB Economic Benefit Study
  • 1988 Airport Risk Assessment & 1992 Wrongful Death Case
  • MDOT Airport Improvement Program Grant Funding History
  • Airplanes that Already Use ARB that 800′ Additional Runway Won’t Change
  • Airports Handbook, NBAA Guidance for Supporting Your Local Airport
  • 1991 ALP Weight Capacity Engineering Study – increased from 12,000 lbs to 30,000 lbs since 1978
  • 1994 User Complied Criticle Airplanes
  • 1994 Medical Use Support
  • 1994 UM Statement
  • 1991 ALP Weight, B-II Class & Line Of Site Letter
  • 1990 FAR Part 150 Update Memo – Safety
  • 1994 Airport Users Unmet Needs Rent Strike Demands
  • 1991 ALP Design Deficiencies from C-II to proposed B-II
  • FAA AC 150_5300_13 Pages 15-22_273-304
  • FAA Order 1050.1E – Environmental Impacts: Policies and Procedures
  • FAA Environmental Assessment Study Process Flow Chart
  • Airports Handbook, NBAA Guidance for Supporting Your Local Airport